105,000 villagers in 5 Wilayas now have access to drinking water
____________
COUNTRY:
Mauritania
____________
CUSTOMER:
Ministry of Water and Sanitation
____________
FUNDER:
French Development Agency (AFD)
____________
PROJECT AIM:
Construction of 81 solar / hydrid-powered drinking water supply systems for 120.000 villagers from the 5 Wilayas (HODH EL CHARGUI, HODH EL GHARBI, ASSABA, GUIDIMAKHA et GORGOL).
____________
ROLES OF VERGNET HYDRO:
Supply and installation
____________
MISSION DATES :
2017 – 2019
____________
BUDGET :
7 000 000 euros
[cq_vc_metrocarousel images=”24828″ buttontype=”cycle” buttoncolor=”fg-lightOrange”]
TECHNICAL CHARACTERISTICS :
- 81 piped water networks combining 471 km of pipes (Ø63 to Ø110 in HDPE)
- 63 new water tanks volume 20 to 100m³ level 12 to 15m
- 68 solar fields for a total of 200 KWc
- 200 standpipes
- 20 livestock water throughs
- 3500 individuals water connection
- 69 trainings