7,200 villagers supplied with osmosis water and 100% drinking water
____________
COUNTRY:
Mozambique
____________
CUSTOMER:
Belgium Cooperation
____________
FUNDER:
Belgium Cooperation
____________
PROJECT AIM:
Treatment of brackish water in the Province of Gaza by solar powered reverse osmosis
____________
ROLES OF VERGNET HYDRO:
Supply and installation
____________
MISSION DATES :
2017 – 2018
____________
BUDGET :
690 000 euros + 382 000 euros
[cq_vc_metrocarousel images=”24817,24819,24821,24823″ buttontype=”cycle” buttoncolor=”fg-lightOrange”]
TECHNICAL CHARACTERISTCS:
- 6 treatment stations for brackish water
- 6 water tanks on towers ranging between 7 and 12 meters tall and with a capacity of 15 to 42 m3
- Average depth of submerged pumps : 40 m
- 8 km of water pipe
- 6 solar fields from 11 kWp to 22 kWp.