Approximately 600,000 people now have access to safe drinking water
____________
COUNTRY:
GUINEA
____________
CUSTOMER:
SNAPE
____________
FUNDER:
AFD
____________
PROJECT AIM:
To meet the drinking water needs of approximately 600.000 people in the villages of Upper Guinea through the construction of 1.100 water points equipped with manual pumps, 12 solar-powered small piped network and 5.000 latrines
____________
ROLES OF VERGNET HYDRO:
Supply and installation of 1403 manual pumps and the construction of 6 solar-powered small piped networks
____________
MISSION DATES:
2007 – 2008
____________
BUDGET :
2 747 615 €
[cq_vc_metrocarousel images=”24019″ buttontype=”cycle” buttoncolor=”fg-lightOrange”]
TECHNICAL CHARATERISTICS:
- 1143 HPV60-2000 installed
- 5 training sessions for repairmen
- 4 after-sales service campaigns
- 6 on fill water tanks from 20 to 30 m³ and from 0 to 6.5 m tall
- 6 solar systems for 9kWp of power provision
- 120 km of pipes