The installation of all the networks of the new TERRA-2 Port of Abidjan Terminal
____________
COUNTRY:
Côte d’Ivoire
____________
CUSTOMER:
NGE CONTRACTING
____________
FUNDERS:
____________
PROJECT AIM:
On 15 January 2020, the Port Autonome d’Abidjan and TERRA (Terminal Routier d’Abidjan) signed a concession agreement for the new road terminal in Côte d’Ivoire, under which TERRA undertook to invest €20 million in the development of new storage areas, the construction of operating buildings and the gradual renewal of equipment. When the work is completed, TERRA will be able to handle 70,000 vehicles per year.
____________
ROLE OF VERGNET HYDRO:
In 2020, SAHER, a subsidiary of VERGNET HYDRO, is entrusted with the installation of all the networks (drinking water supply, fire-fighting, rainwater, wastewater and dry networks) of the new TERRA-2 Port of Abidjan terminal.
____________
DATES OF MISSION:
September 2020 – February 2021
____________
BUDGET:
1 million euros
TECHNICAL CHARACTERISTICS:
- 10 km of pipelines installed
- 2 pressure boosting systems
- 2 micro-treatment plants
- 3 hydrocarbon separators
- Building plumbing network