1st large-scale drinking water supply project in Ivory Coast to supply 150,000 villagers with drinking water
___________
COUNTRY:
Ivory Coast
____________
CUSTOMER:
National Drinking Water Agency (ONEP)
____________
FUNDERS:
European Union via Kreditanstalt für Wiederaufbau (KfW)
____________
PROJECT AIM:
Construction of 29 drinking water supply systems and rehabilitation of 13 drinking water supply systems for more than 150 000 villagers in Ivory Coast’s western regions.
____________
ROLE OF VERGNET HYDRO :
Supply and installation
____________
MISSION DATES:
2016- 2017
____________
BUDGET :
882 500 euros
[cq_vc_metrocarousel images=”23911,23915″ buttontype=”cycle” buttoncolor=”fg-lightOrange”]
TECHNICAL CARACTERISTICS :
- 42 networks of 130 km in total
- 15 small piped networks on generators ranging from 8 to 17 kVA and 27 small piped networks connected to the national electricity grid
- Tanks : 8 of 20 m3, 29 of 30 m3 and 4 of 50 m3
- Chlorination of Dosatron-type
- Manifold made of stainless steel
- Electric pumps submerged for Total Manometric Head from 50 to 100 m and a capacity from 2 to 7 m3 per hour
- 313 standpipes.