CONTINUOUS SUPPLY OF DRINKING WATER TO THE LOCAL POPULATION EVEN IN ADVERSE WEATHER CONDITIONS
____________
COUNTRY:
Ivory Coast
____________
CUSTOMER:
Ministry of Hydraulics – Ivory Coast and ONEP.
____________
FUNDERS:
Islamic Development Bank
____________
PROJECT AIM :
Continuous supply of drinking water to the local population even under adverse weather conditions
____________
ROLE OF VERGNET HYDRO :
Supply and installation
____________
DATES DE LA MISSION :
December 2019 – June 2021
____________
BUDGET :
3.2 millions euros
TECHNICAL CHARACTERISTICS:
- 17 water towers (20 m3 to 12 m in polyester, 30 m3 to 80 m3 of 12 to 15 m metal)
- 6.96 km of PeHD pipes for standpipes and private connections
- 78.8 km of PVC pipes for the distribution network
- Solar, thermal or electric hybrid systems with source inverter