5,500 villagers from the Province of Gaza now have access to safe drinking water
____________
COUNTRY:
Mozambique
____________
CUSTOMER:
Belgium Cooperation
____________
FUNDER:
Belgium Cooperation
____________
PROJECT AIM:
Construction of solar-powered water drinking systems for 5.500 villagers from the province of Gaza.
____________
ROLES OF VERGNET HYDRO:
Supply and installation
____________
MISSION DATES:
2017 – 2018
____________
BUDGET :
640 000 euros
[cq_vc_metrocarousel images=”24017″ buttontype=”cycle” buttoncolor=”fg-lightOrange”]
TECHNICAL CHARATERISTICS :
- 5 new drinking water supply networks cumulating 21.2 km (from Ø40 to Ø75 in HDPE electrofusion)
- 5 water towers with reservoirs between 7 and 12 m meters tall and with a capacity of 20 to 40 m3
- Average depth of submerged pumps : 40 m
- 16 stand pipes
- 5 livestock watering trough
- 5 solar fields.from 1.3 to 4.2kWc, with a total of 11.7 kWc installed.